Technical Service Bulletin SSM 50320 — 2020 FORD GT
ELECTRICAL SYSTEM
Bulletin Details
| TSB ID | SSM 50320 |
| Manufacturer | |
| Vehicle | 2020 FORD GT |
| Component | ELECTRICAL SYSTEM |
| Communication Date |
Bulletin Summary
Some 2017-2021 Ford GT vehicles built on or before 22-Sep-2021 may need to have a new battery installed for service or maintenance purposes. A new battery design has been released for service and requires a different battery tray and a different local interconnect network (LIN) connector. This is due to the new battery design being dimensionally smaller and will not properly secure in the original battery tray. The LIN connector socket in the new battery is keyed differently and the original connector shell will not plug in. The LIN connector shell will need to be de-pinned, so the new connector shell can be installed. When installing new battery part number MG7Z-10655-*, the following battery tray and LIN connector must be used: battery tray MG7Z-10732-A, LIN connector shell MG7Z-9A624-A. Refer to Workshop Manual, Section 414-01 for battery tray replacement.
About Technical Service Bulletins
A Technical Service Bulletin (TSB) is a document issued by a vehicle manufacturer to its dealers, describing a known issue with a specific vehicle or set of vehicles and the recommended procedure to fix it. Unlike recalls, TSBs are not mandatory and are typically only performed if an owner reports the related issue. However, TSBs can be an indicator of common problems with a vehicle.
Other TSBs for the 2020 FORD GT
SSM 50693
EQUIPMENT
21B26
ENGINE AND ENGINE COOLING
TSB 21-2011
ENGINE AND ENGINE COOLING
TSB 21-2011
EQUIPMENT
TSB 21-2059
POWER TRAIN
TSB 20-2352
EQUIPMENT