Technical Service Bulletin SB-49-5 — 2012 THOMAS BUILT BUSES SAF-T-LINER C2
FUEL SYSTEM, DIESEL:STORAGE:TANK ASSEMBLY
Bulletin Details
| TSB ID | SB-49-5 |
| Manufacturer | |
| Vehicle | 2012 THOMAS BUILT BUSES SAF-T-LINER C2 |
| Component | FUEL SYSTEM, DIESEL:STORAGE:TANK ASSEMBLY |
| Communication Date |
Bulletin Summary
THOMAS BUILT: WHEN DIESEL EXHAUST FLUID (DEF) SYSTEM SITS FOR EXTENDED LENGTH OF TIME, THE TANK MAY CRYSTALLIZE AROUND FLOAT ON DEF LEVEL SENDING UNIT TUBE AND NEEDS CLEANING OR IT CAN CAUSE FLOAT TO STICK. MODEL SAF-T-LINER C2. NO MODEL YEARS LISTED. *PE
About Technical Service Bulletins
A Technical Service Bulletin (TSB) is a document issued by a vehicle manufacturer to its dealers, describing a known issue with a specific vehicle or set of vehicles and the recommended procedure to fix it. Unlike recalls, TSBs are not mandatory and are typically only performed if an owner reports the related issue. However, TSBs can be an indicator of common problems with a vehicle.
Other TSBs for the 2012 THOMAS BUILT BUSES SAF-T-LINER C2
SF571 FCCC Bus C
ENGINE AND ENGINE COOLING
ICI18-012 TBB FL
SEATS
ICI18-013 TBB FL
EQUIPMENT
SS468968
UNKNOWN OR OTHER
54-19
ELECTRICAL SYSTEM:12V/24V/48V BATTERY
12-033
EQUIPMENT:OTHER:OWNERS/SERVICE/OTHER MANUAL
sbt5418
ENGINE AND ENGINE COOLING