Technical Service Bulletin 08-401-25 — 2025 DODGE HORNET
ELECTRICAL SYSTEM
Bulletin Details
| TSB ID | 08-401-25 |
| Manufacturer | |
| Vehicle | 2025 DODGE HORNET |
| Component | ELECTRICAL SYSTEM |
| Communication Date |
Bulletin Summary
Flash: Power Inverter Module (PIM) Updates Customers may experience the following: ● The vehicle is not performing a scheduled cabin preconditioning. 'Cabin Preconditioning Unavailable' message present when the scheduled cabin condition is not performed as planned. This bulletin involves reprogramming the Auxiliary Hybrid Control Processor (AHCP) and Hybrid Control Processor (HCP) also known as PIM, with the latest available software.
About Technical Service Bulletins
A Technical Service Bulletin (TSB) is a document issued by a vehicle manufacturer to its dealers, describing a known issue with a specific vehicle or set of vehicles and the recommended procedure to fix it. Unlike recalls, TSBs are not mandatory and are typically only performed if an owner reports the related issue. However, TSBs can be an indicator of common problems with a vehicle.
Other TSBs for the 2025 DODGE HORNET
08-042-26
ELECTRICAL SYSTEM
08-042-26
ENGINE
18-097-25
ELECTRICAL SYSTEM
S2308000041 REV.B
ELECTRICAL SYSTEM
08-279-25
ELECTRICAL SYSTEM
S2508000015
ELECTRICAL SYSTEM